Next Level mining photo gallery

Image Description
Control room at mining operation
Control room at mining operation

Control room at mining operation_1

ABB control room at mining operation
ABB control room at mining operation

ABB control room at mining operation_2

ABB control room at mining operation
ABB control room at mining operation

ABB control room at mining operation_3

ABB control room at mining operation
ABB control room at mining operation

ABB control room at mining operation_4

Dual Pinion Mill Drive
Dual Pinion Mill Drive

Dual Pinion Mill Drive

RMD and staff at Boliden Aitik mine
RMD and staff at Boliden Aitik mine

RMD and staff at Boliden Aitik mine

RMD at Boliden Aitik mine
RMD at Boliden Aitik mine

Ring-geared mill drive at Boliden Aitik mine

Eduardo Gallestey
Eduardo Gallestey

Eduardo Gallestey, Head of Product Management Mining, ABB

Giuseppe Di Marco
Giuseppe Di Marco

Giuseppe Di Marco, Managing Director, Process Industries business unit, ABB

Patrik Westerlund
Patrik Westerlund

Patrik Westerlund, Global Product Manager Underground Mine Automation, ABB

Service engineer
Service engineer

Service engineer

Ventilation system
Ventilation system

Ventilation system

Control room
Control room

Control room

Underground
Underground

Underground

Boliden Garpenberg mine
Boliden Garpenberg mine

Boliden Garpenberg mine

The Garpenberg Mine control room
The Garpenberg Mine control room

The Garpenberg Mine control room, staffed with four operators with who can monitor everything on a single user interface, thanks to ABB`s System 800xA system.

Boliden Chief Executive Officer Lennart Evrell
Boliden Chief Executive Officer Lennart Evrell

Boliden Chief Executive Officer Lennart Evrell listens to the safety and security instruction during the ABB-organized press trip to the Garpenberg Mine on June 9, 2015.

The Garpenberg Mine’s administration building and 40-meter hoist tower
The Garpenberg Mine’s administration building and 40-meter hoist tower

The Garpenberg Mine’s administration building and 40-meter hoist tower

A Garpenberg Mine station
A Garpenberg Mine station

A Garpenberg Mine station a kilometer underground where ore is brought from the tunnels to be reduced in size before proceeding to the mill.

Ore on a conveyor system overseen by ABB’s System 800xA control solution advances toward the skip, where it will be hoisted to the surface for milling.
Ore on a conveyor system overseen by ABB’s System 800xA control solution advances toward the skip, where it will be hoisted to the surface for milling.

Ore on a conveyor system overseen by ABB’s System 800xA control solution advances toward the skip, where it will be hoisted to the surface for milling.

An elevator at 1054 meters below the surface, for transporting miners to Garpenberg’s underground operation.
An elevator at 1054 meters below the surface, for transporting miners to Garpenberg’s underground operation.

An elevator at 1054 meters below the surface, for transporting miners to Garpenberg’s underground operation.

Ring-geared mill drives
Ring-geared mill drives

One of ABB’s ring-geared mill drives at Boliden’s Garpenberg Mine

Another Garpenberg process controlled and monitored by ABB’s System 800xA control system: Boliden’s concentrator.
Another Garpenberg process controlled and monitored by ABB’s System 800xA control system: Boliden’s concentrator.

Another Garpenberg process controlled and monitored by ABB’s System 800xA control system: Boliden’s concentrator.

System 800xA control system for mines
System 800xA control system for mines

Colleagues from ABB and Boliden explain to journalists on the press trip the latest mobile communication devices that are fully integrated with the System 800xA control system.

Per page